Getting scarily close now. Today i had the day off work which meant i could catch up on a lot of things which need to be done in office hours. I rented a car and drove all over the place getting various jobs done. I picked up the fridge box in Havant, drove to Southampton to get the insulation, drove to Hamble to get some batteries, drove to osport to drop off the stack pack and pick up some stainless, drove to Fareham to pick up some stanchion bases, and then came back down to the marina and worked on the fridge till dark. The evaporator is now fitted, i just need to finish the insulation and it should be ready to fit on Friday. I am hoping to have a cold beer from the fridge sometime on friday night!! Fingers crossed, there is still a lot to do.
Once the galley is done things should ease off a bit and it is really just electrical and plumbing work from here on. I am trying to fit a holding tank but there are not many around of a suitable size/shape. Trying to suss out the regs in France with regards to this...
Electrically, need to fit the chart plotter, new switch panel, battery charger and isolator, plus wire in the fridge. The electrics are all over the place at the moment so i am chatting to the previous owner to try and sort out what's going on...
Until next time!
Simo
Tuesday, 31 March 2009
Wednesday, 25 March 2009
Around the Island
Since I bought her, I had always pencilled in the weekend of the 14th-15th March for a test sail to France. Unfortunately my registration papers hadn't come through in time so I couldn't leave the UK, but still wanted to give her a good test so decided on a weekend trip to Poole around the Isle of Wight. Because of the huge tides in the UK (5m) the marina I am in is only accessible for 6 hours each tidal cycle. This restricts the leaving times of some trips, and the earliest I could get out was 10:30am. Lee, Steve, Ed and myself all met down there and got her ready, but when I went to start the diesel she just wouldn't go. We stuffed around a bit before putting a multimeter to the batteries to discover that the shore power battery charger just wasn't working at all. The batteries were dead. I had already discovered that they would need replacing when I had an electrician on board, but this sort of quickened the process!
£70 later she started first go and we were off into a 20kt westerly. We cruised through some anchored merchant vessels to Bembridge Ledge, and swung around the limestone cliffs towards St Catherine's point, taking turns at spilling coffee all through the galley as the wind strengthened to 25kt and we were forced to put a reef in. We were now heading right into the wind and tacked wide, hitting a nasty bit of wind/swell/tide combination which was great for practicing clipping in and out of the harness on the fore-deck.

As we approached Freshwater bay things settled a bit and we shook out a reef (while others also "shook out a reef" - Ed), approaching the needles as the sun set. Here we decided we wouldn't make for Poole, but head north back into the Solent, and spend the night at Lymington. On a broad reach down the Solent we were making 8 knots boat speed with the sun setting behind us - magic. Heading into the Lymington channel we noticed a few buoys missing on our 8 yr old charts, and ran softly aground in the mud as an island ferry passed by. No worries - a big push astern and we were off again. We moored at Lymington Yacht Haven about 8pm absolutely exhausted, and only managed a few beers at the pub before crashing out.

Making a quick getaway in the morning to avoid the marina fees (they caught us in the end), it was dead calm, but with the tide pushing us north we were content to drift around in the still sunshine and just soak it all in. I went up the mast to check it all out and the view from the top was pretty amazing. Slowly the wind filled in and we hoisted some sail, cracked open a beer, and cranked up the tunes. We stopped by in Cowes for lunch, meeting up with Tom, Fiona, Luke, Emma and Harvey for a roast.

The ride back was a bit of a slog into the tide, and we just missed the sill back into the marina, leaving Painkiller on the waiting pontoon, and returning at midnight to ease her back in.
View Larger Map
£70 later she started first go and we were off into a 20kt westerly. We cruised through some anchored merchant vessels to Bembridge Ledge, and swung around the limestone cliffs towards St Catherine's point, taking turns at spilling coffee all through the galley as the wind strengthened to 25kt and we were forced to put a reef in. We were now heading right into the wind and tacked wide, hitting a nasty bit of wind/swell/tide combination which was great for practicing clipping in and out of the harness on the fore-deck.

As we approached Freshwater bay things settled a bit and we shook out a reef (while others also "shook out a reef" - Ed), approaching the needles as the sun set. Here we decided we wouldn't make for Poole, but head north back into the Solent, and spend the night at Lymington. On a broad reach down the Solent we were making 8 knots boat speed with the sun setting behind us - magic. Heading into the Lymington channel we noticed a few buoys missing on our 8 yr old charts, and ran softly aground in the mud as an island ferry passed by. No worries - a big push astern and we were off again. We moored at Lymington Yacht Haven about 8pm absolutely exhausted, and only managed a few beers at the pub before crashing out.

Making a quick getaway in the morning to avoid the marina fees (they caught us in the end), it was dead calm, but with the tide pushing us north we were content to drift around in the still sunshine and just soak it all in. I went up the mast to check it all out and the view from the top was pretty amazing. Slowly the wind filled in and we hoisted some sail, cracked open a beer, and cranked up the tunes. We stopped by in Cowes for lunch, meeting up with Tom, Fiona, Luke, Emma and Harvey for a roast.

The ride back was a bit of a slog into the tide, and we just missed the sill back into the marina, leaving Painkiller on the waiting pontoon, and returning at midnight to ease her back in.
View Larger Map
Saturday, 21 March 2009
New Beginnings

Well here we are - the first entry. I have been trying to find time to do this for weeks now, but like a lot of the jobs i have had to do there is no time like the present, and 30 mins before i head out for a curry with Rupert is as good a time as any.
It's been a crazy couple of months here in Portsmouth, and every week just gets a little more hectic.
I'll start at the beginning of the 'journey'. When i look back it's hard to even remember when i first looked at Painkiller. I think it was sometime around June of last year. I had been looking a lot online, and i remember she didn't jump straight out at me, even though she did come out in all the searches i was doing (20-25k 32-34 ft). What i was really after was a Nicholson 35 but unfortunately they are as rare as hens teeth and that has pushed the price of the available ones up. When i first rang the broker i explained that i was looking for a nic 35 but he convinced me to have a look at Painkiller and i really liked her.
Of course i couldn't buy the first one i saw so i looked and looked, visiting all the used boat shows, looking at a lot of terrible boats i could afford and a lot of beautiful boats i couldn't. When i compared them to the first she won hands down. I put in a low offer which was rejected, so the day before i flew back to Australia in October i went and had a second viewing.
Just before i flew back to the UK we came to an agreement and it was ON!!
The survey went OK, but there was a dodgy repair on the keel so she had to come out of the water. It was so cold in January that we couldn't even do a sea trial as the diesel wouldn't start! Ice was literally forming on the slipway as she was hauled up! Finally after weeks of stuffing around the deal was finally sealed on the 30th of January, and i got the keys!
She was out of the water for 3 weeks in total for the repair, which also gave me time to come to terms with what i had just bought, and how much upkeep there was going to be! Luckily Nige and Luke were there to help with the antifouling!

On the 24th of Feb i moved her from Gosport to Southsea, which was the first time I'd been at the wheel! Unfortunately there was absolutely no wind, but the previous owner came along and talked me through all the little specifics of her rig and setup.
Because of visa troubles and the keel problems i now had just 2 months to get her ready. It was always going to be a mission. It's great having a goal to work to, and every minute i spend on board i get more and more attached.
Here's her new home!
View Larger Map
Subscribe to:
Posts (Atom)
